Để sử dụng toàn bộ tiện ích nâng cao của Hệ Thống Pháp Luật vui lòng lựa chọn và đăng ký gói cước.
Nếu bạn là thành viên. Vui lòng ĐĂNG NHẬP để tiếp tục.
THE PRIME MINISTER OF GOVERNMENT | SOCIALIST REPUBLIC OF VIET NAM |
No: 164/2002/QD-TTg | Hanoi, November 18, 2002 |
THE PRIME MINISTER
Pursuant to the December 25, 2001 Law on Organization of the Government;
Pursuant to the Government’s Decree No. 52/1999/ND-CP of July 8, 1999 promulgating the Investment and Construction Management Regulation and Decree No. 12/2000/ND-CP of May 5, 2000 amending and supplementing a number of articles of the Investment and Construction Management Regulation;
At the proposals of the Ministry of Construction in its Report No. 752/BXD-VLXD of May 23, 2002 to the Prime Minister; and of the Ministry of Planning and Investment in its Official Dispatch No. 6493-BKH/CN of October 11, 2002;
Proceeding from the conclusions of the meeting of the concerned ministries and branches held at the Government Office on September 16, 2002,
DECIDES:
Article 1.- To approve the adjusted planning on development of Vietnams cement industry till 2010 and its orientations till 2020, with the following principal contents:
1. Development objectives:
The development objectives of the cement industry till 2010 and its orientations till 2020 are: To fully meet the domestic cement consumption demand (in terms of quantity, quality and categories), spare a part of the total output for export, to quickly develop Vietnams cement industry into a strong industry, equipped with modern production technologies and capable of turning out products which can compete with foreign products of the same categories, thus contributing to the successful realization of the cause of national industrialization and modernization.
...
...
...
- Regarding investment:
The development of the cement industry must ensure the economic efficiency and higher and higher competitiveness of products under the regional and international economic integration conditions; the rational use of natural resources, protection of ecological environment, cultural-historical monuments and landscapes, maintenance of security and national defense. Investment shall only be made in the construction of cement projects under the approved planning and with advanced technologies, low investment and capable investors. To prioritize the investment in cement projects with an annual output of one million tons or more, and at the same time to tap to the utmost the capacity of the existing cement production establishments in order to meet the cement demands of localities.
- Regarding technology:
To use the worlds advanced highly-automated technologies, so as to raise the quality of products and maximally save raw materials, fuels and power; and at the same time to step up the domestic manufacture and processing of machinery, equipment and components, which are up to the product quality and environmental protection criteria according to the Vietnamese and international standards; to diversify cement products and universalize the production of high-quality PCB 40 cement.
- Regarding size and capacity:
To prioritize the development of large-sized high-capacity investment projects, taking into account the specific conditions of each project so as to select appropriate sizes thereof.
- Regarding investment capital sources:
To mobilize to the utmost domestic capital sources (credit capital, project bonds, own capital, equity capital, capital mobilized through the securities market, etc.) for investment in the cement industry. To diversify the capital-mobilizing modes and investment forms so that all economic sectors can participate in investing in the cement production. New cement projects shall take the form of joint-stock companies, where the State corporations shall hold controlling stakes. The State shall provide capital support for the construction of infrastructure works outside the plant fences for investment projects in difficult geographical areas. Cement investment projects shall be entitled to borrow preferential loans for manufacturing parts of equipment, machinery and accessories, which can be processed or manufactured at home. If joint-venture projects with foreign countries, which are currently engaged in the cement production, wish to expand their investment scale, they must increase the Vietnamese sides legal capital proportion to 40% or higher.
- Regarding the planning layout:
...
...
...
- Regarding the inter-branch coordination:
To enhance the alignment and coordination among relevant branches and sectors, such as: mechanical engineering, communications and transport, supply of technical supplies, infrastructure construction, etc., with a view to best serving the cement industrys development, and concurrently creating conditions for development of other industries. To mobilize to the utmost capabilities of such sectors as mechanical engineering, metallurgy, information technology, automation, etc., for researching into, designing and manufacturing equipment, technologies and accessories for the cement industry, with a view to quickly raising the localization rate thereof. The Government shall provide State budget support for the procurement of advanced technologies for designing and manufacturing cement-producing machines and equipment to substitute for imported ones. For cement investment projects with a capacity of over one million tons/year and grinding stations with a capacity of 0.5 million tons/year, the mode whereby investors award contracts directly to domestic mechanical engineering corporations which are fully capable of acting as main contractors to design technologies, manufacture and supply equipment in complete sets for the projects, shall be applied. For large cement projects, the use rate of goods and/or equipment processed or manufactured at home must attain at least 60% of the total weight and 30% of the total value thereof.
3. Planning norms:
- Technical norms in the cement production:
Projects on investment in development of the cement industry must strive to attain by 2010 the advanced norms of fuel, raw material, power and material consumption, dust content of exhaust gas, noise intensity, automation rate, percentage of domestically manufactured equipment, labor productivity, diversity of cement categories, product quality, reduction of production cost, and products competitiveness on the regional and world markets.
Some specific norms shall be as follows:
- Thermal energy consumption rate: � 730 Kcal/kg of clinker
- Electric power consumption rate: �95 Kwh/ton of cement
- Dust content in exhaust gas: � 50 mg/Nm3.
...
...
...
In the 2002-2005 period:
Year
2002
2003
2004
2005
- Consumption growth rate (%)
20
15
...
...
...
13
- Cement demand (million tons)
19.70
22.60
25.70
29.10
- Estimated output (million tons)
16.0
17.80
...
...
...
22.00
In the 2006-2010 period and till 2015 and 2020
Year
2006
2007
2008
2009
2010
2015
...
...
...
- Growth rate (%)
12
12
10
10
10
5-8
2.5-3
- Demand (million tons)
...
...
...
36.50
40.10
44.20
48.60
63-65
68-70
- Estimated output (million tons)
27.95
35.30
...
...
...
47.60
49.80
62.80
The lists of investment projects and their construction schedules and the cement industry�s demands (see the enclosed appendices) include:
+ The list of cement investment projects till 2010.
+ The list of investment project on independent grinding stations.
+ Investment capital and some main supplies for the cement production.
+ Number of officials, engineers and technical workers needed for the cement production.
...
...
...
1. The Ministry of Construction shall have to:
- Manage and direct the implementation of this adjusted planning; coordinate with the concerned ministries in studying and perfecting mechanisms and policies, and seeking measures to accelerate the tempo of investment in cement projects in order to overcome the cement shortage by 2005 and afterwards. In the course of implementation direction, any matters rising beyond its competence must be reported to the Prime Minister for consideration and decision.
- Base itself on the countrys economic development situation in each period to propose to the Prime Minister contents which need to be adjusted to make the planning suit the practical situation.
- Assume the prime responsibility and coordinate with the Ministry of Industry in working out a program on and directing the domestic manufacture of equipment, machinery and components to substitute for imported ones, and at the same time assume the prime responsibility and coordinate with the Ministry of Planning and Investment and the Ministry of Finance in studying policies to support domestic units to use, and take part in the manufacture of, equipment, accessories, materials and raw materials for Vietnam’s cement industry.
2. The Ministry of Natural Resources and Environment shall coordinate with the Ministry of Construction in planning, surveying, exploring and measuring reserves of raw materials for cement production in a complete and accurate manner, in timely service of the elaboration of long-term and short-term development plans of the cement industry.
3. The Ministry of Finance, the Ministry of Planning and Investment and the State Bank of Vietnam shall jointly study support policies and seek forms of mobilizing investment capital sources for the cement industry’s projects.
4. The Ministry of Communications and Transport shall assume the prime responsibility and coordinate with the Ministry of Construction in working out plans for communications and transport development in a synchronous manner to serve the cement industry, such as: specialized transport means and non-specialized transport means, loading-unloading equipment, the system of river ports and seaports, the system of railroads and land roads, the planning on construction locations of the system of cement - clinker silos and storage, special-use conveyor belts at ports.
5. The Ministry of Education and Training shall assume the prime responsibility and coordinate with the Ministry of Construction and the Ministry of Labor, War Invalids and Social Affairs in working out plans on and directing the organization of postgraduate training of officials, training of engineers and skilled workers to meet the cement industrys development requirements in three forms of new-recruit training, advanced level training and re-training.
6. The Ministry of Science, Technology and Environment and the Ministry of Construction shall devise plans to step up scientific, technical and technological activities in the cement industry along the direction of absorbing and applying the worlds technological and technical advances, raising the consultation capability in the domains of project management and execution, technology research, development and transfer, and market expansion.
...
...
...
Article 3.- The Ministry of Construction shall base itself on the objectives, viewpoint and targets of this adjusted planning to elaborate five-year and annual plans on the industrys development investment suitable to the whole countrys demands and economic capability.
Article 4.- This Decision takes effect 15 days after its signing.
The ministers, the heads of the ministerial-level agencies, the heads of the agencies attached to the Government, the presidents of the Peoples Committees of the provinces and centrally-run cities, Vietnam Cement Corporation, the concerned corporations and companies shall have to implement this Decision.
FOR THE PRIME MINISTER
DEPUTY PRIME MINISTER
Nguyen Tan Dung
LIST OF CEMENT INVESTMENT PROJECTS TILL 2010 AND ORIENTATIONS TILL 2020
(Promulgated together with the Prime Ministers Decision No. 164/2002/QD-TTg of November 18, 2002)
Ordinal number
...
...
...
De-
signed capacity
Construc-
tion
duration
Total invest-ment
capital (million USD)
Estimated output (million tons)
...
...
...
2004
2005
2006
2007
2008
2009
2010
Total capacity
...
...
...
5,583.88
1.80
2.80
6.00
11.95
19.30
26.05
31.60
...
...
...
1.
Transitional investment in the 1999 - 2002 period
7.80
934.68
1.80
2.80
4.70
6.00
...
...
...
7.30
7.80
7.80
1.1
Bim Son cement plant (renovated and expanded)
3.20
2001-2006
240.00
1.80
...
...
...
1.80
2.00
2.20
2.70
3.20
3.20
1.2
Tam Diep cement plant
1.40
...
...
...
229.00
-
0.40
1.10
1.25
1.40
1.40
1.40
1.40
...
...
...
Hai Phong cement plant (new)
1.40
2001-2004
200.68
-
0.20
1.00
1.25
1.40
...
...
...
1.40
1.40
1.4
Phuc Son cement plant (Hai Duong province)
1.80
2001-2005
265.00
-
0.40
...
...
...
1.50
1.80
1.80
1.80
1.80
2.
Investment in the 2001 - 2005 period
24.80
...
...
...
-
-
1.30
5.95
12.50
18.25
22.80
24.00
2.1
...
...
...
1.40
2002-2005
201.00
-
-
0.50
1.00
1.25
1.40
...
...
...
1.40
2.2
Thang Long cement joint-stock company
2.30
2002-2006
346.57
-
-
-
...
...
...
1.20
1.70
2.30
2.30
2.3
Ha Long cement plant
2.10
2002-2006
265.63
...
...
...
-
-
0.30
1.20
1.60
2.10
2.10
2.4
Thai Nguyen cement plant
...
...
...
2002-2006
185.00
-
-
-
0.70
1.00
1.25
1.40
...
...
...
2.5
Tuyen Quang cement plant
> 0.6
2003-2005
70.00
-
-
0.20
0.35
...
...
...
0.60
0.60
0.60
2.6
Hoang Thach 3 cement plant
1.20
2003-2005
96.00
-
...
...
...
0.40
1.00
1.20
1.20
1.20
1.20
2.7
Van Xa 2 cement plant
0.30
...
...
...
20.00
-
-
0.20
0.30
0.30
0.30
0.30
0.30
...
...
...
But Son 2 cement plant
1.40
2003-2006
120.00
-
-
-
0.50
1.00
...
...
...
1.40
1.40
2.9
Ha Tien 2 - 2 cement plant
1.20
2003-2006
96.00
-
-
...
...
...
0.20
0.90
1.20
1.20
1.20
2.10
Thanh Ba cement plant
> 0.60
2003-2006
...
...
...
-
-
-
0.20
0.40
0.60
0.60
0.60
2.11
...
...
...
1.20
2003-2006
81.00
-
-
-
0.10
0.45
0.60
...
...
...
1.20
2.12
Cam Pha cement plant
2.30
2003-2007
280.00
-
-
-
...
...
...
0.80
1.50
2.00
2.30
2.13
Binh Phuoc cement plant
2.00
2003-2007
260.00
...
...
...
-
-
-
0.50
1.00
1.50
1.80
2.14
Chin fon - Hai Phong 2 cement plant
...
...
...
2004-2006
112.00
-
-
-
0.50
1.00
1.40
1.40
...
...
...
2.15
Thanh My cement plant
2.50
2004-2008
325.00
-
-
-
-
...
...
...
1.70
2.20
2.50
2.16
Yen Bai cement plant
> 0.60
2004-2007
70.00
-
...
...
...
-
-
0.20
0.40
0.60
0.60
2.17
Dong Lam cement plant
2.30
...
...
...
280.00
-
-
-
-
-
0.40
1.00
1.70
...
...
...
Investment in the 2006 - 2010 period
14.15
1,401.00
-
-
-
-
-
...
...
...
1.00
2.00
3.1
Dong Banh cement plant
1.40
2006-2010
185.00
-
-
...
...
...
-
-
-
-
0.50
3.2
My Duc cement plant
2.00
2006-2010
...
...
...
-
-
-
-
-
-
-
0.50
3.3
...
...
...
2.30
2007-2010
280.00
-
-
-
-
-
-
...
...
...
0.50
3.4
Nghi Son 2 cement plant
2.15
2007-2010
172.00
-
-
-
...
...
...
-
-
-
0.50
3.5
Binh Phuoc 2 cement plant
2.00
2008-2011
160.00
...
...
...
-
-
-
-
-
-
-
3.6
Thang Long 2 cement plant
...
...
...
2008-2012
184.00
-
-
-
-
-
-
-
...
...
...
3.7
Ha Long 2 cement plant
2.00
2010-2013
160.00
-
-
-
-
...
...
...
-
-
-
4
Investment in the 2011-2015 period
2.80
370.00
-
...
...
...
-
-
-
-
-
-
4.1
Anh Son cement plant
1.40
...
...
...
185.00
-
-
-
-
-
-
-
-
...
...
...
Nam Dong cement plant
1.40
2012-2015
185.00
-
-
-
-
-
...
...
...
-
-
LIST OF INVESTMENT PROJECTS ON INDEPENDENT CEMENT GRINDING STATIONS
(Promulgated together with the Prime Minister�s Decision No. 164/2002/QD-TTg of November 18, 2002)
Ordinal number
Names of plants
De-
signed capacity
Construc-
tion
duration
...
...
...
Estimated output (million tons)
2003
2004
2005
...
...
...
2007
2008
2009
2010
Total capacity
3.66
140.50
...
...
...
1.88
3.17
3.66
3.66
3.66
3.66
3.66
1.
Company 406 QK9 - Can Tho province (with expanded capacity)
...
...
...
2002-2003
1.50
0.12
0.14
0.16
0.18
0.18
0.18
0.18
...
...
...
2.
An Giang cement grinding station(with expanded capacity)
0.30
2002-2003
1.50
0.15
0.20
0.25
0.30
...
...
...
0.30
0.30
0.30
3.
Ha Tien cement company (with expanded capacity)
0.18
2002-2003
1.50
0.12
...
...
...
0.16
0.18
0.18
0.18
0.18
0.18
4.
Hiep Phuoc grinding station (under Construction Material Corporation 1)
0.50
...
...
...
14.00
0.30
0.40
0.50
0.50
0.50
0.50
0.50
0.50
...
...
...
Hiep Phuoc grinding station (under Construction Corporation 1)
0.50
2002-2003
14.00
0.30
0.40
0.50
0.50
0.50
...
...
...
0.50
0.50
6.
Vinh Long cement grinding station
1.00
2003-2004
50.00
-
0.50
...
...
...
1.00
1.00
1.00
1.00
1.00
7.
Nhon Trach grinding station (Da Nang roofing tile company)
0.50
2003-2004
...
...
...
-
0.10
0.30
0.50
0.50
0.50
0.50
0.50
8.
...
...
...
0.50
2004-2005
29.00
-
-
0.30
0.50
0.50
0.50
...
...
...
0.50
DEMANDS FOR INVESTMENT CAPITAL AND SOME MAJOR SUPPLIES
FOR CEMENT PRODUCTION
(Promulgated together with the Prime Ministers Decision No. 164/2002/QD-TTg of November 18, 2002)
Ordinal number
Demands
Units of calculation
2003 - 2005
2006 - 2010
...
...
...
Total investment capital
Million USD
2,850.96
1,706.33
1.1
2003
-ditto-
510.61
...
...
...
2004
-ditto-
1,202.38
1.3
2005
-ditto-
1,137.97
...
...
...
2005
2010
2.
Raw materials
...
...
...
Limestone
Million tons
21.6
47.7
2.2
Clay
-ditto-
4.8
13.2
...
...
...
Plaster
-ditto-
0.7
1.57
2.4
Cement additives
-ditto-
3.9
8.7
...
...
...
Fuels and engergy
3.1
Coal
-ditto-
2.54
4.4
...
...
...
Electricity
Billion kWh
2.1
4.75
4.
Other supplies
...
...
...
Alkaline brick and alum
1,000 tons
15.8
28.1
4.2
Chamotte brick
-ditto-
7.8
13.9
...
...
...
Pellet
-ditto-
4.6
8.1
4.4
Package
Million pieces
287.5
633.2
...
...
...
DEMAND FOR TRAINED OFFICIALS, ENGINEERS AND TECHNICAL WORKERS FOR THE CEMENT PRODUCTION
(Promulgated together with the Prime Ministers Decision No. 164/2002/QD-TTg of November 18, 2002)
Unit: Person
Ordinal number
List of jobs and occupations
2001 � 2005
2006 - 2010
2001 - 2010
...
...
...
2,355
10,990
13,345
1
Intermediate-level, skilled workers
1,335
6,230
7,565
2
...
...
...
255
1,190
1,445
3
Technical and managerial officials of university or higher degree
765
3,570
4,335
...
...
...
3.1
Technology
216
1,008
1,224
3.2
...
...
...
75
350
425
3.3
Energy
60
280
340
3.4
...
...
...
15
70
85
3.5
Finance-accountancy
54
252
306
3.6
...
...
...
345
1,610
1,955
THE PRIME MINISTER OF GOVERNMENT
Nguyen Tan Dung
- 1Decision No. 507/QD-BXD dated April 27, 2015, approval for lime industry development planning to 2020 and a vision to 2030
- 2Decision No. 1488/QD-TTg dated August 29, 2011, ratifying the cement industry development plan in Vietnam for the period 2011 - 2020 with vision to 2030
- 3Decision No. 970/1997/QD-TTg of November 14, 1997 ratifying the planning for development of the cement industry to the year 2010
- 1Decision No. 507/QD-BXD dated April 27, 2015, approval for lime industry development planning to 2020 and a vision to 2030
- 2Decision No. 1488/QD-TTg dated August 29, 2011, ratifying the cement industry development plan in Vietnam for the period 2011 - 2020 with vision to 2030
- 3Decree No. 12/2000/ND-CP of May 05, 2000, amending and supplementing a number of articles of the investment and construction management regulation issued together with the Government’s Decree No. 52/1999/ND-CP of July 8, 1999
- 4Decree No. 52/1999/ND-CP of July 8, 1999, promulgating the regulation on investment and construction management
Decision No.164/2002/QD-TTg of November 18, 2002 approving the adjusted planning on development of Vietnames cement industry till 2010 and its orientations till 2020
- Số hiệu: 164/2002/QD-TTg
- Loại văn bản: Quyết định
- Ngày ban hành: 18/11/2002
- Nơi ban hành: Thủ tướng Chính phủ
- Người ký: Nguyễn Tấn Dũng
- Ngày công báo: Đang cập nhật
- Số công báo: Đang cập nhật
- Ngày hiệu lực: Kiểm tra
- Tình trạng hiệu lực: Kiểm tra