Hệ thống pháp luật

THE PRIME MINISTER OF GOVERNMENT
------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom - Happiness
-------------

No: 95/2001/QD-TTg

Hanoi, June 22, 2001

 

DECISION

RATIFYING THE PLANNING ON VIETNAM ELECTRICITY DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT

THE PRIME MINISTER

Pursuant to the Law on Organization of the Government of September 30, 1992;
At the proposal of Vietnam Electricity Corporation (Official Dispatch No.149 EVN/HDQT-KH of June 21, 2000); considering the State Evaluation Council’s opinions on investment projects (Official Dispatch No.95/TDNN of November 24, 2000), and opinions of the relevant ministries and branches regarding the ratification of the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account,

DECIDES:

Article 1.- To ratify the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account (called Electricity Planning V for short) with the following major contents:

1. On the demand for load:

To firmly develop, raise the quality of, and fully satisfy the demand for, load in service of people’s daily life as well as socio-economic development, security and defense; to meet the requirements of national industrialization and modernization. The power plants throughout the country are expected to produce between 45 and 50 billion kWh, by the end of 2005, 70 -80 billion kWh by 2010 and 160-200 billion kWh by 2020.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



a/ The development of power sources must satisfy the above-said load demand, ensuring the safe, qualitative, stable, efficient and rational supply of electricity for socio-economic development. To fully exploit energy sources with economic efficiency such as hydroelectric power, gas-fired thermal power, coal-fired thermal power and oil-fired thermal power, as well as new forms of energy..., in combination with the step-by-step reasonable exchange of electricity with regional countries. To give priority to the building of hydroelectric power plants with integrated benefits such as flood fighting, water supply, electricity production. To develop small-sized hydroelectric power plants, wind power, solar power...in areas far from power grids as well as mountain, border and island regions.

b/ The balance of power sources must take into account projects on the construction with intensive investment and technological renovation of the currently operating plants; meet the environmental standards and use modern technologies for the new power plants.

- To combine power sources invested in forms of independent power plants (IPP), BOT power plants or joint ventures and exchange electricity with the neighboring countries... in order to supply electricity for each region and the whole electric system.

- To ensure that the total capacity of foreign-invested projects in forms of BOT, IPP or joint ventures... account for not more than 20% of the system’s maximum capacity.

c/ Power sources must be structured in compatibility with the practical situation and fuel sources, ensuring the system’s exploitation efficacy and characteristics of each locality so as to take initiative in the supply of electricity based on the requirements of socio-economic development and people’s daily life in the dry and rainy seasons, including the years when hydroelectric power plants fall short of water as well as the high-demand and low-demand hours, thereby ensuring enough water sources for agriculture and flood fighting when necessary.

d/ To boost the power source projects according to the set plan and schedule (see the list in Appendix 1 to this Decision).

The capacity, location and time for the construction of power source projects shall be decided by the competent authorities when approving the feasibility study report of each specific project.

3. On the development of power grids:

a/ To build power grids of from high tension to low tension synchronously with power sources. To overcome the current state of unsafe, obsolete, patchy and high-loss power grids.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



- The competence to decide investment in power transmission lines and transformer stations shall comply with the general provisions of the Regulation on Investment and Construction Management (the Government’s Decree No.52/1999/ND-CP of July 8, 1999 and Decree No.12/2000/ND-CP of May 5, 2000). For projects with investment decided by branches and localities, the electricity branch’s agreement is required.

- Projects on transformer stations and power transmission lines of 110 kV or under shall be decided by the Managing Board of the Vietnam Electricity Corporation in accordance with this Decision.

- For power grid development projects for the years after 2010, the Ministry of Industry shall coordinate with branches and localities in directing Vietnam Electricity Corporation to specify them according to the planning and plans before submitting them to the Prime Minister for consideration and decision.

c/ The power grid development projects shall comply with the list in Appendix 2 to this Decision.

4. On the supply of electricity for rural and mountainous areas:

a/ The Ministry of Industry shall coordinate with the concerned branches and localities in directing Vietnam Electricity Corporation to continue implementing the Prime Minister’s Decision No.22/1999/QD-TTg of February 13, 1999 ratifying the project on rural electricity and Decision No.294/QD-TTg of April 7, 2000 ratifying investment in the project on rural energy according to the set plan and schedule.

b/ The Ministry of Industry shall coordinate with branches and localities in elaborating a plan on the supply of electricity for deep-lying, remote, border and island areas, proposing mechanisms and policies for effective implementation, and submit it to the Prime Minister for consideration and decision. The plan must classify areas to be supplied with electricity from the national electricity system and areas to be supplied with on-the-spot electricity from diesel, wind or solar power source, from small-sized hydroelectric power plants or geothermal sources... For the areas to be supplied with electricity from the national electricity system, where, however, the on-spot power sources can be developed efficiently, such sources should be considered for development.

5. On investment capital sources:

a/ The Vietnam Electricity Corporation shall play a key role in supplying electricity for socio-economic development and people’s daily life. It may mobilize all capital sources for investment in power source and grid projects according to mechanism of self-borrowing and self-repaying (borrowing ODA capital, credit capital inside and outside the country, borrowing export credit from equipment suppliers and capital for equipment procurement to be repaid with commodities...) and continue observing the mechanism whereby the central bodies, localities, State and people jointly develop rural power grids.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



6. On financial mechanism:

a/ To allow the Vietnam Electricity Corporation to retain the annual capital use levy, which constitutes a source of State budget capital allocated for investment in building power projects.

b/ To carry out plan on the rational adjustment of electricity prices from now to 2005.

7. On the renovation of managerial organization and raising of the electricity branch’s operation efficiency:

a/ The Vietnam Electricity Corporation shall continue restructuring its organization, reforming administrative procedures and dividing responsibility for investment decision with a view to raising the production and business efficiency to meet the requirements of electricity development in the coming period.

b/ The Vietnam Electricity Corporation shall invest in boosting the domestic manufacture of electric equipment, first of all focusing on the manufacture of complete equipment for medium- and low-voltage grids, then proceeding to manufacture complete equipment for 110-220 kV grids, gradually reducing the volume of equipment imported from overseas.

c/ The Ministry of Industry, branches and localities shall enhance the State management and draw up specific regulations according to their respective competence so that different economic sectors may take part in electricity investment and business to meet the country’s increasing demand.

Article 2.- Tasks of the concerned ministries, branches and localities and The Vietnam Electricity Corporation:

1. The Ministry of Planning and Investment:

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



- The national strategy and policy on energy.

- The planning on the rational exploitation and combined use of the country’s rivers and other energy sources.

2. The Ministry of Industry:

a/ To direct the electricity branch to implement Electricity Planning V according to the set plan and schedule. To direct the Vietnam Electricity Corporation to work out a plan on organizational restructure in line with the branch development planning in the next 10 years before submitting it to the Prime Minister for approval.

b/ To regularly evaluate and update the demand for load and fuel for electricity production so as to work out a program on rational development of power sources and grids to meet the whole country’s demand after 2005. In case of big changes in the demand for load and capability of supplying fuel sources for electricity production, the Ministry should take initiative in calculating and promptly adjusting Electricity Planning V and submit it to the Prime Minister for approval.

c/ To assume the prime responsibility and coordinate with the concerned ministries and branches in promptly promulgating legal documents related to the electricity branch’s activities; finalizing the Bill on Electricity so as to report it to the Government for submission to the National Assembly for promulgation according to the set plan.

d/ To assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment, the Ministry of Construction and the Ministry of Planning and Investment in further materializing the program on the electricity "demand-supply management" (DSM), which puts forth incentive policies in combination with propagation, education, inspection and supervision... for the effective implementation of the DSM program.

e/ To assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment and concerned agencies in finalizing the pre-feasibility study report for the nuclear power plant project, and submit it to the Prime Minister for consideration and approval.

f/ To assume the prime responsibility and coordinate with the ministries and branches in directing the exchange of electricity with neighboring countries and Vietnam’s participation in the electricity system linking countries in Mekong river basin.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



h/ To direct the Vietnam Electricity Corporation to work out the hydroelectric cascade planning; guide economic sectors to take part in the investment and business of small and medium hydroelectric power projects. Cases falling beyond its competence shall be reported to the Prime Minister for consideration and decision.

i/ To assume the prime responsibility and coordinate with the concerned ministries, branches and localities in directing the exchange of electricity with neighboring countries and Vietnam’s participation in the electricity system linking countries in the Mekong river basin.

3. The Vietnam Electricity Corporation:

a/ To take the prime responsibility for ensuring the stable, safe and sustainable supply of electricity for socio-economic development and people’s daily life.

b/ To implement solutions to reduce electricity loss to around 10% by 2010; raise the capacity and increase the number of operation hours of power plants; control the load so as to raise the business efficiency; realize the program on saving electricity in production and consumption, saving investment capital right in the Corporation and the entire society for the sustainable development of the electricity branch.

Article 3.- The Minister of Industry, the heads of the concerned ministries and branches and the presidents of the People’s Committees of the provinces and centrally-run cities, the Managing Board and the general director of Vietnam Electricity Corporation shall have to implement this Decision.

 

 

PRIME MINISTER




Phan Van Khai

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



APPENDIX I

PROGRAM ON POWER SOURCE DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
(Issued together with the Prime Minister’s Decision No.95/2001/QD-TTg of June 22, 2001)

I. POWER SOURCES EXPECTED TO OPERATE IN THE 2001-2005 PERIOD

Names of plants Capacity (MW) Years of completion

a/ Power sources managed by the Vietnam Electricity Corporation:

1. Phu My 1 (mixed gas turbines ) 1,090 MW 2001

2. Pha Lai 2 (coal-fired thermal power plant) 600 MW 2001

3. Ialy hydroelectric power plant (2 remaining units) 360 MW (720 MW) 2001

4. Ham Thuan- Da Mi hydroelectric power plant 475 MW 2001

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



6. Phu My 2- 1 (Steam drum) 143 MW 2003

7. Phu My 4 (mixed gas turbines ) 450 MW 2002-2003

8. Expanded Phu My 2-1 (Steam drum) 140 MW 2003

9. Expanded Uong Bi (coal-fired thermal power plant) 300 MW 2004-2005

10. O Mon (Oil-gas) 600 MW 2004-2005

11. Dai Ninh (hydroelectric power plant) 300 MW 2005

12. Rao Quan 70 MW 2005

b/ BOT power sources:

1. Can Don (hydroelectric power plant) 72 MW 2003

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



3. Phu My 2-2 * 720 MW 2004

c/ IPP power sources:

1. Na Duong (coal) 100 MW 2003-2004

2. Cao Ngan (coal) 100 MW 2003-2004

3. Ca Mau (mixed gas turbines ) 720 MW 2005-2006

4. Cam Pha thermoelectric power plant (coal) 300 MW 2004-2005

Note: * Where the negotiation on Phu My 2-2 contract fails, the Vietnam Electricity Corporation shall look for capital sources to build the plant.

II. POWER SOURCES EXPECTED TO OPERATE IN THE 2006-2010 PERIOD

Names of plants Capacity (MW) Years of operation
and completion

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1. Cua Dat 120 MW 2006-2007

2. Se San 3 273 MW 2006-2007

3. Na Hang (Dai Thi) 300 MW 2006

4. A Vuong 1 170 MW 2007-2008

5. Plei Krong 120 MW 2007-2008

6. Ban Mai (Ban La line) 260 MW 2008-2009

7. Dong Nai 3 & 4 510 MW 2008-2009

8. An Khe + Ka Nak 155 MW 2008-2010

9. Buon Kuop 280 MW 2008-2010

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



11. Tranh river 2 200 MW 2008-2010

12. Son La (to be built according to the Xth National Assembly’s resolution at its 9th session).

b/ Thermoelectric power sources for which the feasibility study reports shall be elaborated for submission and approval:

1. Hai Phong thermoelectric power plant (coal) 600 MW 2006-2008

2. Lang Bang thermoelectric power plant (coal) 300 MW 2008-2010

3. Southern gas-fired thermal power plant
(location depends on gas source) 1,200 MW 2007-2010

4. Thai Binh gas-fired thermal power plant - The capacity
shall depend on the gas source’s capacity 2007-2008

c/ Electricity exchange with Laos and Cambodia:

The capacity and time of exchange shall depend on the negotiation process.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



III. ORIENTATIONS FOR POWER SOURCES TO OPERATE IN THE 2011-2020 PERIOD

a/ On hydroelectricity:

- To supplement the planning on hydroelectric power system on the main rivers, to proceed with the elaboration of pre-feasibility and feasibility study reports for projects with high efficiency so as to submit them for ratification according to current regulations.

- To actively make all-round preparations for the building of Son La hydroelectric power plant according to the prescribed contents; the construction scope and time shall be decided by the Prime Minister upon approval of the project’s feasibility study report.

- To study a number of hydroelectric power storage projects for future use.

b/ On thermoelectric power sources:

To prepare investment in projects based on the capacity of fuel sources (gas, coal, oil...) so as to define locations in Cuu Long river delta, northern provinces and coastal region for submission and approval.

c/ On nuclear power:

The Ministry of Industry shall assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment in finalizing an overall report on the development of nuclear power in Vietnam, to be submitted to the Prime Minister for consideration in 2001-2002.

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



APPENDIX II

PROGRAM ON POWER GRID DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
(Issued together with the Prime Minister’s Decision No. 95/2001/QD-TTg of June 22, 2001)

I.1. 500 KV POWER LINES

No.

Names of projects

Number of circuits x km

Operation years

1. The 2001-2005 period

1

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 547

2002

2

Pleicu - Dung Quat - Da Nang

1 x 280

2003 - 2004

3

Phu My - Nha Be

2 x 49

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



4

Nha Be - Phu Lam

1 x 16

2002

5

Nha Be - O Mon

1 x 180

2004 - 2005

6

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 150

2005

2. Expectation for the 2006 - 2010 period

1

Nho Quan - Thuong Tin

1 x 75

2006 - 2010

2

Feeder to Nho Quan station of 500 KV

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2006 - 2010

3

Phu Lam - O Mon

1 x 170

2006 - 2010

4

Ha Tinh - Nho Quan

1 x 260

2006 - 2010

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Ha Tinh - Da Nang

1 x 390

2006 - 2010

6

Feeder to Dong Nai 3 & 4

2 x 20

2006 - 2010

3. Orientation for the 2011 - 2020 period

1

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 180

2011 - 2020

2

Son La - Nho Quan

1 x 240

"

3

Son La - Soc Son

2 x 200

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



4

Soc Son - Trang Bach

1 x 95

"

5

Trang Bach - Thuong Tin

1 x 110

"

6

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 5

"

7

Phu My - Bien Hoa

1 x 40

"

8

Bien Hoa - Tan Dinh

1 x 30

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



9

Feeder to Hoc Mon - Hoc Mon

2 x 10

"

10

Bien Hoa - Thu Duc

2 x 20

"

11

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 160

"

12

Nha Trang - Nuclear power - Di Linh

1 x 160

"

13

Nuclear power - Bien Hoa

2 x 170

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



I.2. 500 KV TRANSFORMER STATIONS

No.

Names of projects

Number of transformers x MVA

Capacity - MVA

Operation years

1. The 2001 - 2005 period

1

Ha Tinh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



450

2002

2

Da Nang

1 x 450

450

2004

3

Di Linh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



450

2005

4

O Mon

1 x 450

450

2005

5

Tan Dinh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



450

2004 - 2005

6

Nha Be

2 x 600

1,200

2002

7

Phu My

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



450

2002

2. Expectation for the 2006 - 2010 period

1

Nho Quan

1 x 450

450

2006 - 2010

2

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 450

450

2006 - 2010 (Transformer 2)

3

Tan Dinh

1 x 450

450

2006 - 2010

4

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 450

450

2006 - 2010

5

Dung Quat

1 x 450

450

2006 - 2010

3. Orientation for the 2011 -2020 period

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Son La

1 x 450

450

2011 - 2020

2

Soc Son

2 x 1000

2,000

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Trang Bach

1 x 450

450

"

4

Viet Tri

2 x 450

900

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Hoc Mon

2 x 750

1,500

"

6

Bien Hoa

2 x 450

900

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Nha Trang

1 x 450

450

"

8

Thanh Hoa

1 x 450

450

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Thu Duc

2 x 600

1,200

"

1. The 2001 - 2005 period

No.

Names of projects

Number of transformers x MVA

Capacity (MVA)

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Northern provinces

1

Mai Dong

2 x 250

500

2001 - 2002

Replacement of transformers

2

Soc Son

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2001 - 2005

 

3

Bac Giang

1 x 125

125

2001

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Pho Noi

2 x 125

250

2001 - 2005

 

5

Trang Bach

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

6

Quang Ninh

1 x 125

250

2001- 2005

 

7

Vat Cach

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2001

 

8

Viet Tri

2 x 125

250

2001 - 2005

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Ha Tinh

1 x 125

125

2002

 

10

Thai Binh

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

11

Dinh Vu

1 x 125

125

2004 - 2005

 

12

Bac Ninh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2004 - 2005

 

13

Xuan Mai

1 x 125

125

2002

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Nam Dinh

1 x 125

125

2002 - 2003

Second transformer

15

Uong Bi

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

16

Yen Bai

1 x 125

125

2004 - 2005

 

17

Nghi Son

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2002

 

18

Thai Nguyen

1 x 125

125

2002 - 2005

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1

Hoa Khanh

2 x 125

250

2001 - 2005

 

2

Hue

1 x 125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2001

 

3

Dung Quat

2 x 63

126

2001 - 2005

 

4

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 125

125

2002 - 2003

Second transformer

5

Krong Buk

1 x 125

125

2002

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



6

Nha Trang

1 x 125

125

2003

"

Southern provinces

1

Long Binh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2001

Replacement of transformers

2

Long Thanh

2 x 125

500

2001 - 2005

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Binh Chuan (Bien Hoa)

2 x 250

500

2001 - 2005

 

4

Bao Loc

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

5

Phu Lam

2 x 250

500

2001 - 2002

Replacement of transformers

6

Thu Duc

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



350

2002

 

7

Tao Dan

2 x 250

500

2002 - 2005

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Cat Lai

2 x 250

500

2002 - 2003

 

9

South of Sai Gon

1 x 250

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

10

Ba Ria

1 x 125

125

2002 - 2003

 

11

Vung Tau

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2002 - 2003

 

12

Tan Dinh

1 x 250

250

2004 - 2005

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Dai Ninh

1 x 63

63

2005

 

14

Vinh Long

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

15

Thot Not

2 x 125

250

2002 - 2003

 

16

Kien Luong

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2002 - 2003

 

17

My Tho

1 x 125

125

2003 - 2004

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Ham Thuan

1 x 63

63

2001

 

19

Bac Lieu

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

20

Chau Doc

1 x 125

125

2003-2004

 

21

Tan Rai

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2005

Aluminum treatment

22

Tri An

1 x 63

63

2004 - 2005

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Northern provinces

1

Yen Phu

1 x 250

250

2006 - 2010

Second transformer

2

Trang Bach

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

"

Second transformer

3

Bac Giang

1 x 125

125

"

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Thai Binh

1 x 125

125

"

 

5

Van Tri

1 x 250

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

6

Hai Duong

1 x 125

125

"

 

7

Dinh Vu

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

"

Second transformer

8

Vat Cach

1 x 125

125

"

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Hai Phong thermoelectricpower plant

2 x 125

250

��

 

10

Dong Hoa

2 x 250

500

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Replacement of transformers

11

Quang Ninh thermoelectric power plant

2 x 125

250

��

 

12

Son Tay

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

��

 

13

Xuan Mai

1 x 125

125

"

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Phu Ly

1 x 125

125

��

 

15

Nghi Son

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Second transformer

Central provinces

1

Hue

1 x 125

125

2006 - 2010

Second transformer

2

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1 x 125

125

2006 - 2010

 

3

Dung Quat industrial park

1 x 250

250

2006 - 2010

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



4

Tuy Hoa

1 x 125

125

2006 - 2010

 

5

Krong Buk

1 x 125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2006 - 2010

Replacement of transformers

Southern provinces

1

South of Sai Gon

1 x 125

250

2006 - 2010

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Hoa Xa

2 x 250

500

2006 - 2010

 

3

Tan Binh

2 x 250

500

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

4

Song May

1 x 125

125

2006 - 2010

 

5

Nhon Trach

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2006 - 2010

 

6

Vung Tau

1 x 125

125

2006 - 2010

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



My Tho

1 x 125

125

2006 - 2010

Second transformer

8

Long An

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

9

Ben Tre

1 x 125

125

2006 - 2010

 

10

Cao Lanh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



125

2006 - 2010

 

11

Kien Luong

1 x 125

125

2006 - 2010

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Ca Mau

1 x 125

125

2006 - 2010

 

13

Soc Trang

1 x 125

125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

14

Phan Thiet

1 x 125

125

2006 - 2010

 

15

Trang Bang

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2006 - 2010

 

16

Chau Doc

1 x 125

125

2006 - 2010

Second transformer

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Northern provinces

1

Dong Anh

2 x 250

500

2011- 2020

 

2

Dong Trieu

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

3

Do Son

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Bim Son

2 x 125

250

2011- 2020

 

5

Cai Lan

2 x 250

500

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

6

Cua Ong

2 x 125

250

2011- 2020

 

7

Hung Yen

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

8

Hoa Lac

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Lao Cai

2 x 125

250

2011- 2020

 

10

Lang Son

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

11

Luu Xa

2 x 125

250

2011- 2020

 

12

Phu Tho

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

13

Quynh Luu

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Son La

2 x 125

250

2011- 2020

 

15

Son Tay

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

16

Sai Dong

2 x 250

500

2011- 2020

 

17

Thach Khe

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



500

2011- 2020

 

18

Trinh Xuyen

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Trang Bach

2 x 125

250

2011- 2020

 

20

Tuyen Quang

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

21

Vinh Phuc

2 x 125

250

2011- 2020

 

22

Vung Ang

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

Central provinces

1

Cam Ranh

2 x 125

250

2011- 2020

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2

Dong Ha

2 x 125

250

2011- 2020

 

3

Ba Don

2 x 125

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2011- 2020

 

4

Dung Quat industrial park

2 x 250

500

2011- 2020

 

5

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 125

250

2011- 2020

 

6

Kon Tum

2 x 125

250

2011- 2020

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



7

Quang Nam

2 x 125

250

2011- 2020

 

Southern provinces

1

Da Lat

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

2

Duc Trong

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



An Phuoc

2 x 125

250

2011- 2020

 

4

An Phuoc

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

5

Binh Chanh

2 x 250

500

2011- 2020

 

6

Binh Long

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

7

Binh Phuoc

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Song Be industrial park

2 x 125

250

2011- 2020

 

9

Long Xuyen

2 x 125

250

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

10

Nhon Trach

2 x 125

250

2011- 2020

 

11

Sa Dec

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

12

Soc Trang

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Song May

2 x 125

250

2011- 2020

 

14

Tan Dinh

2 x 250

500

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

15

Tan Binh

2 x 250

500

2011- 2020

 

16

Tay Ninh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

17

Tam Phuoc

2 x 125

250

2011- 2020

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Thap Cham

2 x 125

250

2011- 2020

 

19

Thu Duc Bac

2 x 250

500

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

20

Tra Vinh

2 x 125

250

2011- 2020

 

21

Xuan Loc

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



250

2011- 2020

 

 

 

 

 

 

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



II. 1. 220 KV TRANSFORMER STATIONS

II.2. 220 KV POWER LINES

No.

Names of projects

Number of circuits x km

Operation years

Notes

1. Projects to be operating and completed in the years of 2001 to 2005

Northern provinces

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Nam Dinh - Thai Binh

1 x 30

2002

2-circuit poles

2

Thai Binh - Hai Phong

1 x 45

2002

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Bac Giang - Thai Nguyen

1 x 55

2003 - 2004

 

4

Viet Tri - Son La

1 x 160

2003 - 2004

Temporary operation of 110 kV power lines

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Dong Hoa - Dinh Vu

2 x 17

2004 - 2005

 

6

Viet Tri - Yen Bai

1 x 75

2004 - 2005

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Feeder to Ha Tinh station

2 x 7

2002

 

8

Uong Bi - Trang Bach

2 x 19

2004 - 2005

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1

Hoa Khanh - Hue

2 x 80

2001

 

2

Da Nhim - Nha Trang

1 x 140

2003 - 2004

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Southern provinces

1

Phu My - Cat Lai

2 x 35

2001

Cables + DZK

2

Cat Lai - Thu Duc

2 x 10

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Cables + DZK

3

Nha Be - Tao Dan

2 x 10

2002 - 2003

 

4

Ba Ria - Vung Tau

2 x 15

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

5

Dai Ninh - Di Linh

2 x 39

2005

 

6

Rach Gia - Bac Lieu

1 x 105

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

7

Tan Dinh - Binh Chuan

2 x 18

2002 - 2004

 

8

Nha Be South of Sai Gon

2 x 7

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

9

Thu Duc - Hoc Mon

1 x 16

2002 - 2003

Circuit 2

10

Long Binh - Thu Duc

1 x 16

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

11

My Tho - Ben Tre

1 x 25

2002

Temporary operation of 110 kV power lines

12

Thot Not-Chau Doc-Tinh Bien

1 x 96

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

13

Joint to O Mon power plant

2 x 15

2004

 

14

O Mon - Thot Not

2 x 28

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



 

15

Bao Loc - Tan Rai

2 x 20

2005

Designed to be made of aluminum

2. Projects designed for the 2006 - 2010 period

Northern provinces

1

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 160

2006 - 2010

 

2

Feeder to Nho Quan station

2 x 5

"

 

3

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 17

"

 

4

Hai Phong thermoelectric power plant - Vat Cach

2 x 19

"

 

5

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 15

"

 

6

Ha Tinh - Thach Khe

2 x 9

"

 

7

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 25

"

 

8

Van Tri - Chem

2 x 10

"

 

9

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 8

"

Circuit 2

10

Vinh - Ha Tinh

1 x 50

"

 

11

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 110

"

 

12

Lang Bang thermoelectric power plant - Hoanh Bo

2 x 15

"

 

13

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 30

"

 

14

Thai Binh thermoelectric power plant - Thai Binh

2 x 20

"

 

Central provinces

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Dung Quat - Dung Quat steel

2 x 9

2006 - 2010

 

2

Ha Song Ba - Tuy Hoa

2 x 40

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Quy Nhon - Tuy Hoa

1 x 95

"

 

4

Tuy Hoa - Nha Trang

1 x 110

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Dong Hoi - Hue

1 x 165

"

 

6

Pleikrong - Pleicu

1 x 50

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



A Vuong - Da Nang

1 x 80

"

 

8

Buon Kuop - Krong Buk

2 x 40

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Tranh river 2- Dung Quat

2 x 75

"

 

10

SeSan 3 - Pleicu

2 x 35

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



1

Hoc Mon - Hoa Xa

2 x 10

2006 - 2010

 

2

Tra Noc - Soc Trang

2 x 75

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



3

Bac Lieu - Soc Trang

1 x 53

"

 

4

Bac Lieu - Ca Mau

1 x 70

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



5

Da Nhim - Da Lat

1 x 50

"

 

6

Kien Luong - Chau Doc

1 x 75

"

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



7

Trang Bang - Tan Dinh

2 x 35

"

 

3. Projects designed for the 2011 - 2020 period

Northern provinces

1

Thanh Hoa - Vinh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2011 - 2020

Circuit 2

2

Hoa Binh - Son Tay

1 x 50

"

 

3

Quang Ninh thermoelectric power plant - Mong Duong

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

4

Bac Giang - Pha Lai

1 x 25

"

Circuit 2

5

Yen Bai - Son La

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

6

Son La - Son La provincial capital

1 x 20

"

 

7

Nam Dinh - Ninh Binh

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

Circuit 2

8

Pho Noi - Sai Dong

2 x 20

"

 

9

Pho Noi - Hung Yen

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

10

Hoanh Bo - Cai Lan

2 x 12

"

 

11

Thanh Hoa - Ba Che

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

12

Tuyen Quang - Thai Nguyen

1 x 70

"

 

13

Dong Anh - Sai Dong

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

14

Da Phuc - Dong Anh

2 x 20

"

 

15

Hung Yen - Long Boi

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

16

Yen Bai - Lao Cai

1 x 110

"

 

17

Son La - Huoi Quang

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

18

Thai Nguyen - Luu Xa

1 x 11

"

 

19

Thai Nguyen - Bac Kan

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

20

Bac Giang - Lang Son

1 x 60

"

 

21

Son La provincial capital - Tuan Giao

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

22

Bac Me - Dai Thi

2 x 60

"

 

23

Ha Tinh -Vung Ang

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



"

 

Central provinces

1

Da Nang - District 3

2 x 8

"

 

2

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



2 x 43

"

 

3

Serepok - Krong Buk

2 x 80

"

 

Southern provinces

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Tra Noc - Vinh Long

1 x 35

2011 - 2020

Circuit 2

2

Ham Thuan - Phan Thiet

1 x 60

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Long Xuyen - Thot Not

1 x 15

"

 

4

Long Binh - Tam Phuoc

2 x 6

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Feeder to Cao Lanh - Cao Lanh

2 x 15

"

 

6

Vinh Long - Tra Vinh

1 x 65

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Tan Dinh - Tay Ninh

2 x 72

"

 

8

Tan Dinh - Tan Dinh industrial park

2 x 8

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Cai Lay - O Mon

1 x 90

"

Circuit 2

10

Cai Lay - Thot Not

1 x 80

"

Circuit 2

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



My Tho - Ben Tre

1 x 25

"

 

12

Bac Lieu - Ca Mau

2 x 65

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Xuan Loc - Long Binh

1 x 40

"

 

14

Long Thanh - An Phuoc

2 x 8

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Nhon Trach - Long Binh

2 x 15

"

 

16

Nhon Trach - Cat Lai

2 x 10

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Nha Trang - Cam Ranh

1 x 35

"

 

18

Tay Ninh - Binh Long

2 x 75

"

 

...

...

...

Please sign up or sign in to your Pro Membership to see English documents.



Dong Nai 6 - Di Linh

2 x 30

"

 

 

HIỆU LỰC VĂN BẢN

Decision No. 95/2001/QD-TTg, ratifying the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account, promulgated by the Prime Minister of Government.

  • Số hiệu: 95/2001/QD-TTg
  • Loại văn bản: Quyết định
  • Ngày ban hành: 22/06/2001
  • Nơi ban hành: Thủ tướng Chính phủ
  • Người ký: Phan Văn Khải
  • Ngày công báo: Đang cập nhật
  • Số công báo: Đang cập nhật
  • Ngày hiệu lực: Kiểm tra
  • Tình trạng hiệu lực: Kiểm tra
Tải văn bản