- 1Decision No. 186/2002/QD-TTg of December 26, 2002, approving the strategy on development of Vietnam’s mechanical engineering industry till 2010, with vision to 2020
- 2Decree No. 189/2007/ND-CP of December 27, 2007, defining the functions, tasks, powers and organizational structure of the Ministry of Industry and Trade.
THE MINISTRY OF INDUSTRY AND TRADE | SOCIALIST REPUBLIC OF VIET NAM |
No. 48/2008/QD-BCT | Hanoi, December 19, 2008 |
THE MINISTER OF INDUSTRY AND TRADE
Pursuant to the Government’s Decree No. 189/2007/ND-CP of December 27, 2007, on the functions, tasks, powers and organizational structure of the Ministry of Industry and Trade;
Pursuant to the Government’s Decree No. 92/ 2006/ND-CP of September 7, 2006, on the formulation, approval and management of socio-economic development master plans, and Decree No.04/2008/ND-CP of January 11, 2008, amending and supplementing a number of articles of Decree No.92/2006/ND-CP of September 7, 2006;
Pursuant to the Prime Minister’s Decision No.186/2002/QD-TTg of December 26, 2002, approving the strategy on development of Vietnam’s mechanical engineering industry till 2010 with a vision towards 2020;
In furtherance of the Government Office’s Official Letter No.3174/VPCP-CN of June 11, 2007, on the assignment by the Prime Minister of the Ministry of Industry (now the Ministry of Industry and Trade) to approve the Planning on development of electric equipment-manufacturing industry in the 2006-2015 period with a vision towards 2025;
At the proposal of the Director of the Heavy Industry Department,
DECIDES:
Article 1. To approve the Planning on development of the electric equipment-manufacturing industry in the 2006-2015 period with a vision towards 2025 with the following principal contents:
1. Development viewpoints
a/ To develop the electric equipment-manufacturing industry in accordance with the strategy for development of Vietnam’s mechanical engineering industry till 2010 with a vision towards 2020 and the national planning on electricity development in the 2006-2015 period with a vision towards 2025 taken into consideration;
...
...
...
c/ The electric equipment-manufacturing industry must serve socio-economic develop-ment in combination with national defense.
2. Development objectives
a/ The industry’s production value will increase about 19-20%/year in the up-to-2010 period and about 17-18%/year on average during 2011-2015;
b/ By 2010, to satisfy 60% of the domestic demands for electric wires and transformers in the 2011-2015 period, then over 70% by 2015. To satisfy 55% of the domestic demands for electric motors and some types of common generators by 2015;
c/ By 2015, Vietnam’s electric equipment-manufacturing industry will reach the regional advanced standards on technologies to manufacture transformers, generators’ electric motors, medium- and high-voltage instruments, electric wires and cables for domestic consumption and export;
d/ The industry’s export turnover is projected to reach 18%/year in the 2011-2015 period and 15% in the 2016-2025 period;
e/ By 2025, Vietnam will be capable of manufacturing and supplying complete electric equipment sets for transmission lines and transformer stations.
3. Development orientations
a/ To make new and intensive investment in advanced technologies for the development of the production of products in which Vietnam has an advantage, raising the manufacturing capacity and the competitiveness of products of enterprises; to encourage investment in the production of import substitutes with high economic efficiency and step up export to the region and the world;
...
...
...
c/ To attach importance to the research into, designing and manufacture of, new and high-quality products;
d/ To enhance the association and coordination among concerned branches and domains, tapping to the utmost various branches’ capabilities to support the research into, designing and manufacture of, equipment systems for the power industry.
4. Planning for development in the period up to 2015
a/ Product development planning
- Static electric machines
+ To focus on and prioritize the development of the production of dry transformers of medium voltage and transmission transformers of 110 kV and 220 kV; to encourage investment in the production of industrial rectifiers;
+ In the immediate future, to make in-depth investment in and scale up the production capacity of existing establishments so as to raise capacity of manufacturing transformers of up to 250 MVA and 220kV;
+ To study and receive the transferred technologies for the production of dry transformers in service of the plan to lay underground power grids in urban centers;
+ To complete the construction of high-voltage experiment centers in two key transformer-manufacturing regions being Hanoi and Ho Chi Minh City before 2010;
...
...
...
+ To attract foreign investment in the manufacture of transmission transformers, special-purpose transformers and industrial rectifiers, to be supplied for the industrial equipment-manufacturing industries;
+ By 2015, to basically satisfy the domestic demands for distribution transformers of uniform national quality standards, trying to meet 50-60% of the demand for 110kV -220k V transformers; and the export value will approximate 30-35% of the industry’s production value.
Production planning
Unit of calculation
Annual average (Up to 2010)
Annual average (2011-2015)
500 kV transformers
MVA
...
...
...
110kV-220kV transformers
MVA
7,000 - 8,000
8,500 – 10,000
Distribution transformers
MVA
40,000 - 50,000
50,000 - 60,000
For export
...
...
...
12,000- 13,000
20,000 - 25,000
- Rotary electric machines
+To attach importance to the development of the production of high-capacity motors, high-voltage motors for industrial processing equipment and hydroelectric generators of up to 50MW; to encourage investment in the production of generators consuming renewable energy (wind, solar, geo-thermal, biogas,...);
+ To invest in the expansion and modernization of existing electric motor-manufacturing lines;
+ To invest in technological chains of regional advanced level to produce high-capacity electric motors, special motors, such as magnetic-brake motors, high-efficiency anti-explosion motors;
+ To assemble generators with a higher and higher localization rate for civil and industrial use, hydroelectric generators, wind generators..., then proceed to master the technologies for designing and manufacturing hydroelectric generators of up to 50MW capacity in service of hydroelectric projects;
+ By 2015, to satisfy 55-65% of the domestic demands for motors and about 50% of the domestic demands for some types of generators of lkV-lOkW capacity; the export value will represent 30-40% of the industry’s production value.
Production planning
...
...
...
Annual average
(Up to 2010)
Annual average
(2011-2015)
Common-use motors
Piece
300,000-350,000
900,000-1,000,000
Special-purpose big motors
Piece
1,000-1,200
...
...
...
Assorted generators
Piece
50,000-55,000
90,000-100,000
Small hydroelectric generators
Piece
10,000-12,000
15,000-17,000
Renewable energy-operated generators
...
...
...
1,000-1,500
4,500-5,000
- Electric instruments
+ To prioritize investment in the development of the production of electronic meters, to encourage investment in the production of high-voltage electric instruments, counting and metering systems, power-grid safety smart supervisors;
+ To invest in new electric meter-manufacturing factories and in the expansion of existing ones to raise their production capacity with a view to satisfying domestic demands and expanding export markets. To concentrate on production of electronic meters;
+ To invest in the construction of factories producing medium- and high-voltage electric instruments of international standards, bringing into full play domestic resources while making full use of foreign investment;
+ To efficiently tap the mode of commercial franchise, incrementally establishing Vietnamese brands in the production of electric boxes and panels as well as complete equipment sets for transformer stations for domestic and foreign markets;
+ By 2015, to satisfy 60-70% of the domestic demands for electric instruments, the export value will represent 19-20% of the industry’s production value.
Production planning
...
...
...
Annual average
(Up to 2010)
Annual average
(2011-2015)
Electric meters and measuring tools
1,000 pieces
4,000-4,500
9,000-10,000
Electric instruments
1,000 pieces
480-550
...
...
...
Electric boxes
set
14,000-15,000
35,000-37,000
- Electric wires and cables
+To prioritize investment in the development of the production of electric cables with waterproof, fire-resistant properties suitable to the tropical environment in service of underground running of urban power grids or high-rise projects; to encourage the production of civil-use high-quality electric wires and cables (environmentally friendly and lead-free), export electric wires and cables;
+ To expand and raise the capacity of existing production chains towards raising technological levels and product quality;
+ To fully operate existing medium- and high-voltage insulated cable-production lines in service of underground running of power supply systems in cities, provincial towns and industrial parks;
+ To invest in the large-scale production of common electric wires and cables for civil and industrial use in service of the machine-tool industry, power supply systems in factories, condominiums and cables for mining pits and seagoing vessels.
...
...
...
Unit of calculation
Annual average
(Up to 2010)
Annual average
(2011-2015)
Bare cables
ton
300,000-350,000
350,000-400,000
Insulated cables
ton
...
...
...
450,000-500,000
Civil-use electric wires
ton
400,000-450,000
400,000-450,000
- Other electric equipment
+ To encourage the development of the production of transmission line components, especially components for high-voltage transmission lines of up to 220kV, for programs on development of national power grids; to encourage the localization of electric equipment for power plants and renewable energy-exploiting systems;
+ To invest in the expansion and raising of the capacity and product quality of transmission line component-manufacturing establishments. To make selective and economically efficient new investment in technologies to produce transmission line components as import substitutes;
+ To call for foreign investment in the production of before- and after-insulator components on transmission lines;
...
...
...
+To invest in factories producing components for the strongly developing shipbuilding industry;
+ To invest in the development, and participate in the production and supply of a number of equipment for thermoelectric and hydroelectric plants for the materialization of the national planning on electricity development in the 2006-2010 period, taking into account a vision towards 2025, which was approved by the Prime Minister in Decision No. 110/2007/QD-TTgof July 18, 2007;
+ To approach technologies to manufacture mechano-electric equipment for power plants of up to 500 MW with a view to satisfying the domestic demands and proceeding to export them;
+ To study and invest in the phased production of components, then complete sets of equipment for transformer stations, compensation stations, transmission line projects....
b/ Investment capital
+ The total investment capital for the development of the electric equipment-manufacturing industry is estimated at about VND 43 trillion in the 2006-2010 period and about VND 136 trillion in the 2011-2015 period.
+ The investment capital will come largely from domestic sources through combined mobilization from own capital, preferential loan capital (for products enjoying priority and development encouragement), commercial loan capital, enterprise bonds, construction work bonds in addition to foreign investment capital.
Major investment projects are listed in the enclosed Appendix.
5. The Planning’s implementation solutions
...
...
...
- To apply non-tariff regulations at the highest level (in conformity with WTO commitments) with a view to restricting import, protecting electric equipment which can be produced at home and creating favorable conditions for small- and medium-sized enterprises to participate in the market;
- To intensify electric equipment investment and market development consultancy; to encourage the purchase of world-famous manufacturing technologies and trade marks.
b/ Investment solutions
- To step up the implementation of projects on the planned list, projects to produce materials of new energy, renewable energy in the spearhead industry;
- To intensify the promotion of, and call for investment in, key projects.
c/ Scientific-technological research, transfer and application solutions
- To build up a system of centers for inspecting electric equipment quality of national standards, proceeding to conformity with international standards;
- To formulate key scientific and technological programs for the development of production of electric equipment; to increase budget for scientific and technological research, provide and guarantee credits for the application of new technologies in the field of electric equipment;
- To encourage all economic sectors to participate in research and innovation and transfer of technical advance; to diversify forms of cooperation and association in conducting research into electric equipment sciences and technologies; to bring into the fullest play the National Fund for Scientific and Technological Development to support scientific and technological activities in the electric equipment-manufacturing industry;
...
...
...
- To establish and regularly update the database of the electric equipment-manufacturing industry and its support industries.
d/ Human resource solutions
- To renew the program on training of personnel for the electric equipment industry, diversifying forms of training and linking training to production reality; to attach importance to the recruitment and sending of science workers and managers for training in developed countries, supporting the training of entrepreneurs;
- To formulate satisfactory preferential treatment mechanisms so as to attract high-quality personnel; to promulgate a legal framework for use as a basis for the recruitment and exchange of human resources among enterprises.
e/ Support solutions
- To periodically review, update and adjust the Planning on development of the electric equipment-manufacturing industry in line with the socio-economic development situation in Vietnam and the world;
- To consolidate the organization and modes of operation of professional associations and form product group-based sub-associations.
Article 2. Organization of implementation
1. The Ministry of Industry and Trade shall assume the prime responsibility for, and coordinate with concerned ministries, branches and provincial-level People’s Committees in, directing, inspecting and proposing mechanisms and policies on development of the electric equipment-manufacturing industry in accordance with the approved Planning.
...
...
...
3. Provincial-level People’s Committees shall, based on the approved Planning, create favorable conditions so that the development projects and programs of the electric equipment-manufacturing industry are implemented in synchronism and uniformity with local socio-economic development master plans.
40. Concerned professional associations shall coordinate with relevant ministries and branches in dissimilating the Planning in forms of propagating, popularizing and guiding it to electric equipment enterprises nationwide so that the latter work out orientations and plans for production and business development in accordance with the Planning.
Article 3. This Decision takes effect 15 days after its publication in “CONG BAO.”
Article 4. Ministries, ministerial-level agencies, government-attached agencies, provincial-level People’s Committees and concerned agencies shall implement this Decision.
MINISTER OF INDUSTRY AND TRADE
Vu Huy Hoang
...
...
...
No.
Project
Projected location
Projected capacity Piece/year
Projected investment
capital (VND billion)
Projected capital source
2006-2010
...
...
...
2016-2025
2006-2010
2011-2015
2016-2025
I
Static electric machines
...
...
...
232
1250
1700
1
Transmission transformer factory
Hanoi
10
30
...
...
...
50
200
100
Commercial loan
2
Intensive investment project on Thu Due (transmission) transformer factory
Thu Duc,
Ho Chi Minh City
100
...
...
...
0
70
0
0
Commercial loan
3
Transmission transformer factory
Hai Phong and Quang Ninh
...
...
...
0
200
200
FDI
4
Dry transformer factory
Da Nang
...
...
...
5,000
0
100
200
FDI
5
Transmission transformer factory
Cam Pha
50
...
...
...
50
112
0
0
Joint venture
6
Special-transformer factory
...
...
...
0
200
200
FDI
7
Transmission transformer factory
Southern Vietnam
...
...
...
200
0
300
200
8
Dry transformer factory
Northern Vietnam
...
...
...
8,000
0
300
200
FDI
9
Project to manufacture industrial rectifiers
Northern/Central Vietnam
...
...
...
50
0
100
200
FDI
10
Project to manufacture industrial rectifiers
Southern Vietnam
...
...
...
50
0
100
200
FDI
11
Special-purpose transformer factory project
...
...
...
3,000
0
150
200
II
Rotary electric machines
...
...
...
843
1,860
1,750
1
Modernization of the Mechano-Electric Equipment Manufacturing Company (manufacturing generators of up to 10,000 kW capacity, electric motors of up to 5,000 kW
Hanoi
...
...
...
45
45
200
Commercial loan
2
Intensive investment in Vietnam-Hungary electric motor-manufacturing company (manufacturing electric motors of up to 2,500 kW)
Hanoi
...
...
...
45
45
100
Enterprise capital
3
Intensive investment project on Unit II of the Mechano-Electric Equipment Manufacturing Company
Le Minh Xuan industrial park. Ho Chi Minh City
24,000
...
...
...
150
200
300
Commercial loan
4
Investment in upgrading Hai Phong Mechano-Electric Equipment Company (manufacturing electric fans, domestic electric appliances)
Hai Phong
...
...
...
30
20
100
Commercial loan
5
Project on LIDICO mechano -electric equipment plant
Ho Chi Minh City
...
...
...
50
0
0
Commercial loan
6
A factory manufacturing and assembling electric motors and generators of up to 2.5 MW
Thuan An, Binh Duong
1,000
...
...
...
123
0
0
Joint venture
7
A factory assembling anti-explosion electric motors of a capacity ranging from 0.75 to 30 kW
Cam Pha
1,000
...
...
...
70
0
0
Joint venture
8
A factory manufacturing small hydroelectric generators of up to 10 MW
Northern Vietnam
...
...
...
150
200
0
FDI
9
Special-purpose electric motors factory
Central Vietnam
...
...
...
100
350
250
FDI
10
Factories assembling big electric machines of up to 300 MW
Southern and Central Vietnam
...
...
...
200
400
200
Commercial loan
11
Wind generator assembling and manufacturing factory
Central Vietnam
...
...
...
100
200
200
FDI
12
Wind generator assembling and manufacturing factory
Southern Vietnam
...
...
...
100
200
200
FDI
13
Mass energy generator-assembling and -manufacturing factory
Southern Vietnam
...
...
...
0
200
200
FDI
III
Electric instruments
...
...
...
750
1,475
1,320
1
Electric equipment manufacturing plant
Thai Nguyen
...
...
...
50
100
70
Commercial loan
2
Expansion of electricity-metering equipment company, intensive investment (TU, TI 1-phase and 3-phase electric meters of 6-35 kV)
Hanoi
...
...
...
55
45
100
Commercial loan
3
Electronic electricity-controlling and -metering equipment factory
Hanoi
150,000
...
...
...
200
200
100
Commercial loan
4
Electronic electricity-controlling and metering-equipment factory
Sai Dong B, Hanoi
2,500
...
...
...
45
100
100
Commercial loan
5
Intensive investment in Electric Instrument Company I (Electric cutting instrument of 35 kV. electric boxes, panels)
Hanoi
...
...
...
30
30
100
Commercial loan
6
New investment project on electric instrument (breaker, relay)-manufacturing plant
Southeastern Cu Chi industrial park
...
...
...
120
200
150
Joint venture/FDI
7
Mechanical/electronic meters factory
Southeastern Cu Chi industrial park
5,000,000
...
...
...
150
100
100
Commercial loan
8
Medium-/high-voltage electric instrument factory
Central Vietnam
...
...
...
0
300
200
FDI
9
Mediun-/high-voltage electric instrument factory
Southern Vietnam
...
...
...
0
200
200
FDI
10
Electric box. panel-manufacturing and assembling factory
Southern Vietnam
...
...
...
100
200
200
Commercial loan
IV
Electric wires, cables and materials
...
...
...
9,235
1,550
800
1
Automobile electric wire and cable factory (Sumitomo)
Hai Duong
...
...
...
345
0
0
FDI
2
Electric wire and cable, equipment and component factories
Thua Thien Hue. and Binh Dinh
200,000 T
...
...
...
50
100
150
Commercial loan
3
Investment project to modernize CADIVI company
Ho Chi Minh City
...
...
...
90
200
150
Commercial loan
4
Investment project to expand Taya company
Bien Hoa
...
...
...
45
150
100
FDI
5
Electric wire and cable factory
Ha Tinh provincial capital
10,000 tons/year
...
...
...
25
0
0
Joint venture/ FDI
6
Medium- and low-voltage cable and communication cable factory
Kim Hoa Binh Xuyen industrial park, Vinh Phuc
...
...
...
80
0
0
Joint venture/FDI
7
Optical cable factory
Quang Minh industrial park, Vinh Phuc
...
...
...
80
0
0
FDI
8
Optical cable factory
Hi-tech park. Ho Chi Minh City
...
...
...
8000
0
0
FDI
9
Electric wire and cable factory
Khanh Hoa industrial park. Da Nang
...
...
...
0
400
0
FDI
10
Project to manufacture electric wires and cables
Quang Chau industrial park, Bac Giang
...
...
...
0
100
0
FDI
11
Underground electric cable factory
Northern Vietnam
...
...
...
150
200
150
Commercial loan
12
Underground electric cable factory
Central Vietnam
...
...
...
100
100
100
Commercial loan
13
Factory manufacturing electric equipment for ships
Central Vietnam
...
...
...
70
100
0
Commercial loan
14
Special electric cable factory
Southern Vietnam
...
...
...
200
200
150
Commercial loan
V
Projects on other electric equipment
...
...
...
2,605
5,130
3,170
Commercial loan
1
Modernization of the Electro-Technical Equipment Corporation
Hanoi
...
...
...
200
100
0
Commercial loan
2
High-voltage electricity experiment centers
Northern, Central and Southern Vietnam
...
...
...
200
300
200
Research and development capital
3
Upgrading electric equipment engineers’ training faculties
Hanoi. Ho Chi Minh City
...
...
...
150
300
200
Training capital
4
Construction of electric equipment personnel training centers
Northern, Southern and Central Vietnam
...
...
...
200
400
250
ODA
5
Ship mechano-electric equipment factory
Hai Duong
...
...
...
150
300
200
Commercial loan
6
Aviation mechano-electric equipment factory
Da Nang
...
...
...
100
400
300
FDI
7
Health service mechano-electric equipment factories
Hanoi, Ho Chi Minh City
...
...
...
150
300
200
ODA
8
Southern agro-mechano-electrical equipment center
Can Tho
...
...
...
150
300
100
ODA
9
Forestry mecha no-electric equipment center
Central Highlands
...
...
...
100
200
200
ODA
10
Domestic appliance-export electric equipment factory
Quang Ninh
...
...
...
0
300
200
FDI
11
Civil electric, electro-refrigerating and electronic equipment manufacturing and assembling chains
Viet Hung industrial park, Quang Ninh
500,000
...
...
...
0
200
0
FDI
12
Electric equipment factory
Chan Hung industrial park
...
...
...
80
0
0
FDI
13
Domestic applicance-export electric equipment factory
Vinh Phuc
...
...
...
0
500
200
FDI
14
Electro-refrigerati ng equipment-manufacturing and -assembling factory
Da Nang industrial park
...
...
...
0
80
0
Joint venture/FDI
15
Special-type battery factory
Binh Xuyen industrial park, Vinh Phuc
...
...
...
80
0
0
FDI
16
Hai Duong chinaware joint-stock company
Hai Duong
1,000 tons/ year
...
...
...
50
100
70
Commercial loan
17
Hoang Lien Son chinaware company
Hoang Lien Son
4,000 tons/ year
...
...
...
50
150
100
Commercial loan
18
Que Vo chinaware and crystal insulator factory
Que Vo
600 tons/year
...
...
...
100
200
150
Commercial loan
19
Minh Long II chinaware company
Dong Nai
1,500
...
...
...
30
0
0
Commercial loan
20
Project on insulator china ware factory
Hue
...
...
...
35
0
0
Commercial loan
21
Project on insulator chinaware factory
Lam Dong
...
...
...
70
0
0
Commercial loan
22
Civil-use electric and electronic equipment manufacturing and assembling factory
Khanh Hoa industrial park, Da Nang
...
...
...
500,000
50
50
0
FDI
23
Solar battery manufacturing and assembling factory
Central Vietnam
...
...
...
150
200
200
Commercial loan
24
Solar battery manufacturing and assembly factory
Southern Vietnam
...
...
...
150
250
200
Commercial loan
25
Building capacity for EPC bidding for (thermo- and hydro-electric) power plants
Hanoi
...
...
...
60
100
150
Commercial loan
26
Expanding capacity for EPC bidding for high-voltage transformer stations
Ho Chi Minh City
...
...
...
70
100
70
Commercial loan
27
Building capacity for EPC bidding for big industrial mechano-electronic works
Northern Vietnam
...
...
...
80
100
80
Commercial loan
28
Center for research and application of new and clean energy sources
...
...
...
150
200
100
ODA
Total
...
...
...
13,665
11,265
8,740
- 1Decree No. 189/2007/ND-CP of December 27, 2007, defining the functions, tasks, powers and organizational structure of the Ministry of Industry and Trade.
- 2Decision No. 186/2002/QD-TTg of December 26, 2002, approving the strategy on development of Vietnam’s mechanical engineering industry till 2010, with vision to 2020
Decision No. 48/2008/QD-BTC of December 19, 2008, approving the planning on development of the electric equipment-manufacturing industry in the 2006-2015 period with a vision towards 2025.
- Số hiệu: 48/2008/QD-BTC
- Loại văn bản: Quyết định
- Ngày ban hành: 19/12/2008
- Nơi ban hành: Bộ Công thương
- Người ký: Vũ Huy Hoàng
- Ngày công báo: Đang cập nhật
- Số công báo: Đang cập nhật
- Ngày hiệu lực: 16/01/2009
- Tình trạng hiệu lực: Còn hiệu lực